Huddersfield University (toilets)

Category
Commercial
About This Project

After winning the tender and appointed as the principal contractor, we worked together with our own carefully selected sub-contractors as well as university nominated contractors.

The works to be carried out were within a live environment with many staff & students still on site. Areas were separated to ensure staff still had access to required workplaces.

Our works consisted of the following:

  • Strip out of male, female and disabled toilets on 3 separate floors
  • Fully refurbish toilets on 3 separate floors, including IPS panels, vanity units & vinyl
  • Suspended ceilings
  • Structural alterations
  • All mechanical and electrical works
  • Tiling and decorations throughout

This project demonstrated how well we can organise a contract to match the desired outcome to a high standard by working onsite whilst works continue in our factory.